These are 100 SPS triggered waveforms collected by the UW-RPI Parkfield array known as PASO-DOS (network code XN-2001 and XN-2002), plus when available the corresponding waveforms from the UC-Berkeley HRSN and from the USGS permanent network. The 59-station array was deployed around the eventual SAFOD drill site. A mix of sensors were deployed, but all were 3-component. The larger events that fell within the array aperture have been picked.
EarthScope Consortium operates the
NSF Geodetic Facility for the Advancement of Geoscience (GAGE)
and NSF Seismological Facility for the Advancement of Geoscience (SAGE).
Any opinions, findings and conclusions, or recommendations expressed
in this material do not necessarily reflect the views of the
U.S. National Science Foundation.