Standing Committee Meeting Report COCOM
May 2006
IRIS CoCom Recommendations to BoD
Stanford Terrace Inn, Palo Alto, CA
May 3, 2006
Common Budget Format for all Programs
IRIS now has a common budget format in preparing and presenting annual
budgets, although the individual programs have yet to implement the
format across individual tasks. Next year, CoCom anticipates building
the budgets across individual tasks in each program using the new format.
2006-2007 Budget Request
CoCom approves the following reserve fund budget requests by program,
and requests BoD approval.
Program
|
Task
|
|
Subtotal
|
GSN
|
|
|
|
|
3 of Q330HR + ancillary components
|
$ 100,000
|
|
|
VSAT spares
|
$ 50,000
|
|
|
Q330HR ancillary components
|
$ 45,000
|
|
|
5 of STS-2
|
$ 83,335
|
|
|
KS54000 sensors
|
$ -
|
|
|
KS54000 repairs
|
$ 100,000
|
|
|
Parascientific microbarographs
|
$ -
|
|
|
G&A
|
$ 11,000
|
|
|
|
|
$ 389,335
|
PASSCAL
|
|
|
|
|
Workshop
|
$ 25,000
|
|
|
5 of STS-2
|
$ 80,000
|
|
|
6 of IP sensors
|
$ 60,000
|
|
|
Active source field software
|
$ 62,500
|
|
|
Passive source field software
|
$ 62,500
|
|
|
Texans
|
$ -
|
|
|
G&A
|
$ 13,750
|
|
|
|
|
$ 303,750
|
DMS
|
|
|
|
|
Small cluster
|
$ 97,531
|
|
|
Tomographic model visualization
|
$ 40,000
|
|
|
4D earthquake visualization
|
$ -
|
|
|
Surface-wave ground motion visualization
|
$ -
|
|
|
G&A
|
$ 4,400
|
|
|
|
|
$ 141,931
|
|
|
|
|
|
|
|
|
Total Reserve Fund
Request
|
|
$ 835,016
|
Carry-over is included in the core budget requests, but is dominated
by the subawards, and is being used to forward-fund 2006-2007 subaward
requests.
Program Highlights at CoCom
GSN
- New DAS review is complete and a single DAS manufacturer identified.
- An implementation plan for DAS deployment is complete.
- Current IRIS funding level is such that the GSN will have to degrade
operations in this and coming years.
- The borehole KS54000 sensors are experiencing increasing failure rates
partially due to their age and poor manufacturer quality control on
recently purchased systems.
- In view of the lack of STS-1 availability and the KS54000 problems,
there is a growing need for low-noise broadband seismometers.
- With the ramping down of EarthScope Backbone construction, senior
staff salary paid by EarthScope will shift back to the GSN.
PASSCAL
- There will be a PASSCAL review in the coming year, as suggested by
NSF.
- The first step to this review is a proposed workshop to look at the
needs for field-processing software and QC for both active and passive
source experiments. Additional items are to keep PASSCAL viable
for the next 5 years.
- Under the current IRIS budget there will be a degradation of PASSCAL
services in the coming years.
- Damage to sensors, especially STS-2 is a continuing problem. This
is exacerbated by Streckeisen’s refusal to train PASSCAL technicians
on STS-2 repair. Quanterra will be training a technician for local
US repairs of STS-2.
- There is a move to CMG-3T because of delivery issues and Guralp’s
willingness to train PASSCAL staff in their repair.
- The PASSCAL SC wants to address the optimal size of the total instrument
pool by considering both PASSCAL and EarthScope instrumentation.
DMS
- The SC wishes to reexamine sensor calibration issues.
- The DMS is concerned for sustainability of service issues because
of the reduced IRIS budget.
- The DMS wants to expand web services and visualization of data and
higher-level data products as a part of their service to both the IRIS
and Earth science community in general. E.g., CMTs.
- The cooperative program with SCEC is ending in October 2006.
E&O
- The draft Educational Seismology Network RFP is almost ready; the
final version will be presented to the BoD for approval.
- E&O continues to develop collaborative programs:
- GeoTeach
- GLOBE proposal
- Ohio Educational initiative
- Question for BoD: If E&O is a small
participant in a large cooperative proposal, the E&O SC requests
BoD guidance on how much Board interaction and/or approval is necessary
prior to proposal submission.
Community Activities
- G&A structure is now shared between core programs and EarthScope,
resulting in a decrease in the G&A rate for core programs.
- CoCom recommends that KNET funding be transitioned over a 3-year time
period to new sources of funding which is consistent with IRIS’ role
of facilitating international programs in seismology. To encourage this
transition CoCom recommends a $20K decrease in this year’s KNET
request, offset by providing 4-5 refurbished Reftek 072A if technical
integration within their existing equipment allows.
- CoCom recommends that the proposed International Coordinator take
responsibility for these and other emerging programs.
- The International Coordinator has two key tasks:
- To develop new sources of funding for IRIS;
- To provide leverage for international organizations and facilities.
- There will be a bi-yearly swing in the community activities budget
as a result of IRIS hosting the Annual Workshop in even years, as directed
by NSF.
- The new NSF agreement is being funded at approximately 75% level,
yet IRIS is moving forward by doing all the work stated in the proposal. Consideration
should be given to producing a statement to NSF as to what can be produced
at this level, but not until an agreement is in place.
EarthScope
- The PASSCAL Chair will update the Board on a proposal for modification
of the Flexible Array instrument procurement plan (also in a document
provided to the Board).
- The Deputy GSN Manager will brief the Board on a proposal to use five
Transportable Array stations to infill missing ANSS Backbone.
- The USArray Project Director will update the Board on USArray status,
including the new baseline accepted in April.
- The EFEC will hold its annual review of USArray 17-18 May. NSF
will be present.
- CoCom expresses concern that 2.5 years into the MREFC, NSF has not
provided any direction on how the O&M plan will be developed.